How can I help you?

Create a new project

Create a new project

Once the camera is connected and all previous steps are set up, users can create a new project. Users mainly utilize capture and delete 360 images to survey the property. There are two ways of creating new projects - with/without a floor plan.

 

Without a floor plan

1. Once the cameras are aligned, go to the position of the first 360 image.

2. Click mceclip7.png button to capture. 

mceclip2.png

3. Move approximately 2 m towards the next position.

mceclip3.png

4. Capture the next 360 image.

mceclip4.png

5. After capturing all the images, click  Asset_21_2x.png  to create a new section or download images from 360 camera.

mceclip6.png

6. Download images from 360 camera. 

 

Now users can edit or upload the project.

 

 

With a floor plan

1. Once the cameras are aligned, go to the position of the first 360 image.

2. Click  mceclip10.png button to capture.

 mceclip8.png

3. Locate the first 360 image on the floor plan, and click mceclip11.png button.

 mceclip9.png

4. Move approximately 2 m towards the next position, and capture the second image.

mceclip13.png

5. Position it on the floor plan.

mceclip12.png

6. After calibrating 1st&2nd 360 image, Quicksite app automatically tracks the distance and direction. 

  • When your current location is incorrect, recalibrate the position.

mceclip15.png

7. Click   Asset_21_2x.png   to finish and download.

mceclip16.png


Now the projects are editable or can be uploaded.

Was this article helpful?
0 out of 0 found this helpful
Have more questions? Submit a request

Articles in this section

Powered by Zendesk